Mr Canham

Solar PV installation of a 4 kWp On-Roof System in Middlesbrough.

Installation of Romag 250w black Solar panels manufactured in the North East, a Goodwe dual string inverter with a 10 year warranty and a slate mounting system was installed to the new MCS 012 specification. This system has over produced by 198 units and has created a energy saving of 39%.

Our customer said “The install was spot on, really chuffed the lads that installed it were great. All the paperwork was done too.”

< BACK TO CASE STUDIES

accreditation-logos